Telecom Egypt – Customer MITT Contracting Company

Fiber Optic Links

Fiber Optic Links connectivity between Exchanges including but not limited to supply and install of single mode F.O.C. with splicing & testing of 60 ODF and the needed F.O. cables 36 core.

FTTH Projects

FTTH Project including installion of fiber optic network Meadows park compound in Sheikh Zayed city beside ALAHLY sporting club new branch, including connectivity of 119 unites.

FTTH Project including installion of fiber optic network at Villar compound in 5th Settlement near Future university, including connectivity of 83 unites.

FTTH Project including installion of fiber optic network at Bellagio compound in 5th Settlement near Future university, including connectivity of 137 unites.

Fiber Optic Access Network

Fiber Optic access network development & maintenance of Greater Cairo, upper EGYPT and Suez Canal cities.

Fiber Optic Transmission Network

Fiber Optic transmission network development including splicing & termination of the main routes between states for example the following routes:

  • Shalateen – Marsa Allam route – 950km 144 core cable.
  • Elsuiz route conversions – 200km 12 & 36 core cable SMW-EMAW.
  • Borg Elarab – North Cost conversions – 80km 12 & 36 core cable.

    Etiam magna arcu, ullamcorper ut pulvinar et, ornare sit amet ligula. Aliquam vitae bibendum lorem. Cras id dui lectus. Pellentesque nec felis tristique urna lacinia sollicitudin ac ac ex. Maecenas mattis faucibus condimentum. Curabitur imperdiet felis at est posuere bibendum. Sed quis nulla tellus.

    ADDRESS

    63739 street lorem ipsum City, Country

    PHONE

    +12 (0) 345 678 9

    EMAIL

    info@company.com